BIM project management
from conception to operation

BIM services throughout the building lifecycle

With our services, we ensure that the building information model is built to a high quality and can be accessed by the project stakeholders on site. We use digitalization tools to monitor and support cost-effective, smooth, and technically sound implementation.

Efficiency-booster BIM services throughout the project

BIM services

BIM project management

We support the achievement of BIM goals throughout the building lifecycle

There can be many purposes for using a BIM model, but a poorly defined information need (LOIN), a construction logistics problem that becomes apparent on the fly, an incompletely built model, or the preparation of an energy simulation can burn up serious hours of engineer time unnecessarily.

BIM project coordination

We manage changes and ensure the expected quality in a common data environment (CDE)

We will create a model-based, shared data environment so that all project participants have access to the latest building plans. We use a Scandinavian project coordination platform to create a transparent, clear, and interactive relationship with the designer and the client, then with the tenderers, and finally with the contractor.

BIM operational advice

Training to help you put BIM into practice in your project

We teach project participants to use technology and processes effectively. This allows everyone involved, from the designer to the client and the contractor, from the skilled labor to the technical and the project manager, to work more efficiently.

BIM strategy

Well-defined BIM requirements and implementation plan are the basis for an effective project

Each project is different from the last, and it always makes sense to use the BIM toolkit to a different depth, with realistic and cost-effective considerations.

We will highlight all the nuances and pitfalls of a BIM project, help you set the right BIM requirements, and help you achieve your BIM goals.

Plan to BIM

Convert 2D plans to 3D BIM models

99% of large, complex, or specialized technology projects in Hungary are built using traditional design methodologies. This usually makes construction more difficult, often more expensive, and, as design errors occur during construction or operation, almost always more problematic.

Whether it’s a greenfield or brownfield project, we can help you with building models from traditional 2D designs. This means that design errors can be detected and corrected before construction starts, and construction itself can be made an order of magnitude more efficient with BIM project management tools.

4D BIM

Model-based scheduling for delay- and penalty-free construction

The design model is fed with manufacturing, installation, hardening, etc., and logical data to build a dynamic schedule that follows the model changes in real-time. We visualize the progress in time with 3D simulation, which helps us to prevent logistical shortcomings and collisions, saving a lot of time, cost, and annoyance.

The additional cost of 4D BIM-based scheduling is minimal for the project as a whole and is recovered within the first few weeks.

5D BIM

Real-time traceable costing, based on real models

All elements of a BIM workflow model can be mapped to a building material and cost information can be associated with them. This enables automatic, real-time updated quantity surveying and budgeting to support management decisions at all stages of the project.

With 5D BIM, we can track and forecast the total cost of a project at every stage of construction. In practice, we use it in combination with 4D.

6D BIM

Simulations and analyses support optimal technical content

With the end of cheap energy, the profitability of your business may depend on designing your buildings to use as little energy as possible.

With the help of building physics and energetics information, we make calculations and simulations that can be used to design the facility to be optimal, economically, and environmentally sustainable, even in virtual space.

7D BIM

Digital twin is the basis for efficient operations

FM software integrated into the as-built model and iOT devices in the building bring the digital twin to life. Interactive communication between the real building and the virtual building, reflecting current real-life conditions, helps energy-efficient operation, quick and easy maintenance, and well-planned expansion and renovation.

We will prepare the model for FM, provide support during the implementation period and update the building model with changes in operation.

Projects

Contact

Our colleagues will be happy to provide you with more information about our BIM services. We help you get the most out of your project, at any stage.

Consult Gábor about our services
Gábor Bazsali

Head of Projectmanagement

+36 70 432 7046

Contact us!

We are happy to get to know good people, new projects, and original technologies!

Whatever the case, don’t hesitate to drop us a message.