How we modeled the Spike Hall transformation project in 4D
- February 13, 2023
The high ceilings, safety risks, short timeframe, and construction conditions required a tight and flawless schedule.
Read more- February 13, 2023
The high ceilings, safety risks, short timeframe, and construction conditions required a tight and flawless schedule.
Read more- February 3, 2023
The survey was carried out using Leica laser scanners, the modeling tasks were carried out in Revit, the design was compared with the as-built condition in Cloudcompare, and the progress was documented with a 360-degree camera using OpenSpace.
Read more